docs(#962): fill epic_chain with the three Epic issues
965 Epic A the timestamp and sweep, 966 Epic B the manual action, 967 Epic C Integration Testing. All three are sub-issues of #962, with Citadel tasks meshcore-open-5vt, -gan and -2jd chained A to B to C. This is a follow-up only because of a sequencing mistake on my part: the plan merged with epic_chain empty, and the grant validator requires a non-empty list while the mint path indexes its first and last entries, so the plan as merged could not have minted anything. The Epic issues need to exist before a plan PR merges, which is how #853 did it. Noted in section 5 so the next plan does not repeat it. No other term changes: budget 3, owner verification, 168-hour expiry, chain true, no flash. Task: meshcore-open-8xj Agent Mail: TealGlen Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>docs/962-epic-chain