Document installed thermal guard test verification

master
Carlo Costanzo 1 month ago
parent e8a16c9681
commit 5e4c152383

@ -45,3 +45,10 @@ host that has shut down requires operator recovery.
Validate the Home Assistant configuration and affected dashboards before
rollout. Exercise dwell, stale-telemetry, hold, and graceful-stop cases with
controlled test fixtures. Do not heat equipment artificially to test the guard.
For operator tests, use checksum-verified snapshots of the installed host and
camera guards. Import their functions with isolated state and fake command
adapters; never invoke the installed programs as an operational test. Verify the
installed checksums again after the run so a stale source copy cannot masquerade as
current production coverage. The notification template and the independent
host/guest shutdown guard protect separate boundaries and both need fixtures.